Notification
Mycryptopot
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • Nft
    • Solana
    • XRP
    • Tron
  • MarketCap
  • Market
  • Forex
  • Mining
  • Metaverse
  • Exchange
  • Regulations
  • Analysis
    • Crypto Bubbles
    • Multi Currency
    • Evaluation
Reading: SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout
Share
bitcoin
Bitcoin (BTC) $ 71,355.00
ethereum
Ethereum (ETH) $ 2,010.55
tether
Tether (USDT) $ 0.999033
bnb
BNB (BNB) $ 653.32
usd-coin
USDC (USDC) $ 0.99952
xrp
XRP (XRP) $ 1.04
binance-usd
BUSD (BUSD) $ 0.999515
dogecoin
Dogecoin (DOGE) $ 0.066191
cardano
Cardano (ADA) $ 0.17352
solana
Solana (SOL) $ 81.29
polkadot
Polkadot (DOT) $ 0.831449
tron
TRON (TRX) $ 0.315381
MycryptopotMycryptopot
Search
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • Nft
    • Solana
    • XRP
    • Tron
  • MarketCap
  • Market
  • Forex
  • Mining
  • Metaverse
  • Exchange
  • Regulations
  • Analysis
    • Crypto Bubbles
    • Multi Currency
    • Evaluation
© 2024 All Rights reserved | Powered by Crypto My Crypto Pot
Mycryptopot > Uncategorized > Mining > SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout
Mining

SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout

March 22, 2026 2 Min Read
Share
image

SoftBank is planning to construct an enormous AI knowledge heart complicated in Ohio able to drawing as much as 10 gigawatts of energy, in accordance with a Bloomberg report.

The ability can be developed on federally owned land at a former uranium enrichment web site, with the primary section anticipated to ship about 800 megawatts of capability by early 2028 at a price of $30 billion to $40 billion, making it one of many largest computing hubs globally.

To assist the buildout, SoftBank is backing roughly $33 billion in pure gasoline energy infrastructure, with generators already sourced and anticipated to be deployed throughout the area by the tip of the last decade. The whole deliberate era capability of about 9.2 gigawatts would rival a number of the largest energy initiatives within the US.

The size displays the surge in demand for AI infrastructure, as hyperscalers and governments race to safe compute and vitality capability. A ten-gigawatt knowledge heart would eat energy similar to hundreds of thousands of properties, placing stress on grids already struggling to maintain up with AI-driven demand.

The challenge is tied to a broader $550 billion US-Japan funding framework that features vitality and industrial infrastructure, and comes as policymakers push to safe home capability within the world AI race.

SoftBank has not but disclosed prospects for the location, however mentioned companions might be concerned in sourcing chips and gear. The corporate is working with native utilities to improve transmission infrastructure, with about $4.2 billion earmarked for grid enlargement.

The proposal additionally highlights rising pressure round AI vitality use. Information heart enlargement has triggered backlash in components of the US over rising electrical energy and water demand, at the same time as governments prioritize constructing out capability to compete with China in superior applied sciences.

Disclosure: This text was edited by Estefano Gomez. For extra info on how we create and overview content material, see our Editorial Coverage.

You Might Also Like

Swiss Crypto Bank Sygnum Expands Institutional Investment Solutions to Germany and Liechtenstein

NFT sales drop 25% to $134m, CryptoPunks plunge 59%

Hut 8 surges on $9.8 billion AI data-center lease, lifting compute sector

APENFT Joins Forces with NextMate AI to Revolutionize TRON NFT Ecosystem

Bitcoin Mining Just Got Tougher as Difficulty Spikes and Hashrate Slips

TAGGED:MiningMining NewsNews
Share This Article
Facebook Twitter Copy Link
Previous Article Ripple Ripple Study Reveals How Financial World Leaders Are Looking At The Market
Next Article Ethereum (ETH) Price Prediction for May 10 ETH Breaks Key Level as ETF Outflows Hit $55M
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -

Popular News

SONEX launches on Soneium’s mainnet 
SONEX launches on Soneium’s mainnet 
Tangle Network Partners with Orochi Network to Advance Blockchain Capabilities
Tangle Network Partners with Orochi Network to Advance Blockchain Capabilities
Bitcoin cargo ship in shallow water beside Treasury auction figures
Bitcoin’s futures pile has a problem: less cash to fuel a rebound
A sealed developing drum produces a Solana-marked print while a magnifier inspects its seam, representing confidential proof generation.
Helius encrypts Solana transfers without removing operator trust
Empty executive chair beside NVIDIA signage and a Bitcoin shadow, illustrating leadership uncertainty spreading to crypto markets.
Bitcoin plunges to $71k as Jensen Huang abruptly resigns sending Nvidia into $2 trillion wipeout
A magenta Solana boardroom table has physical chairs beside outlined future seats, illustrating Forward’s contingent share claims.
Solana treasury Forward Industries flashes a 30% SOL discount, with a catch
- Advertisement -

You Might Also Like

bitcoin btc
Cardano

Cardano ADA 5-Year Price Forecast: $10 By 2030?

September 20, 2025
image
Market

OpenPayd Targets Nasdaq Debut Through $1.1 Billion SPAC Merger with Titan Acquisition

June 4, 2026
image
Exchange

Strike Enhances Services with New Features for Bitcoin Users

July 22, 2026
Thailand SEC Sues OKX: Unlicensed Crypto Exchange Operations
Exchange

Thailand SEC Sues OKX: Unlicensed Crypto Exchange Operations

March 29, 2025
Mycryptopot

"Welcome to MyCryptoPot, your go-to source for the latest insights and developments in the ever-evolving world of cryptocurrency.

Editor Choice

Bitcoin is being hijacked by three “boring” institutional dials that are overpowering the halving’s supply shock
A critical reverse leaves Utah without a Bitcoin reserve, for now
ZBD’s SDK Powers Bitcoin Earnings in Mobile Games, Driving 124% Revenue Growth

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout
Share
© 2024 All Rights reserved | Powered by Crypto My Crypto Pot
Welcome Back!

Sign in to your account

Lost your password?